Production 4 of D-37
31 | |
(7+8+9+10)[Wo] is bonded. It fixes from horizontal direction by the wood screw or clamping, and the weight is put and bonded on. (It bonds between ��2. )As for the board of nine and the board of 5 and 6, (part of a red arrow), the sound leaks from the air room if it doesn't bond well and the horn loading doesn't work though 8 of the reinforcing boards and 4 of the top boards seem for the influence not to exist very much in the sound even if it is not possible to bond. If possible, it to want to be putting on of pressure strongly with the wood screw or the nail. Bonding here is the best dangerous place. The place with an important, red arrow is surely bonded. | |
32 | |
(11+12)[Wo] is bonded. It bonds with sleep the edge + weight. | |
33 | |
(13+14)[Wo] is bonded. It bonds with sleep the edge + weight. | |
34 | |
(19+20+21+22)[Wo] is bonded. Backboard (23+24) is put to confirm the position in which these parts are installed and place decision is done. Position at 138mm from the upper surface. | |
35
| |
(25+26+27+28)..drinking.. bonding. The weight is put and it puts on pressure (if possible, large-scale clamp). After it completes it, it causes shaking of the speaker if it doesn't bond beautifully because it becomes a part where it touches the bottom. | |
36 | |
Board (23+24) in the back is bonded. The part of a red arrow connected the part of a pressure putting on and a blue arrow to me by clamping with the wood screw though it was difficult because the part bonded at a time was a lot of. | |
37 | |
Joint of parts the stairs in opening. 15 boards are bonded. | |
38 | |
Bonding of 16. | |
39 | |
Bonding of 17. | |
40 | |
Bonding of 18. |